Developed projects
 

pexels-kateryna-babaieva-2760241.jpg
WhatsApp Image 2021-12-13 at 13.33.14.jpeg

Lakhami 1 and Lakhami 2 HPPs

Installed Capacity 15,9 MW; Annual Generation 80 mln kWh;

 

In 2014 Energy Solutions has raised the equity investor for project development...

2014-05-22 21.31.14.heic

Aragvi HPP

Installed capacity 8 MW.

 

Contract for construction of 110 kV substation and high voltage power transmission line...

(8).heic

Marneuli HPP

Installed Capacity 250 KW; Annual Generation 1,9 mln kWh

 

In 2014 Energy Solutions acquired building remnants of mini ...

WhatsApp Image 2022-01-19 at 10.16.22.jpeg

Optimization of Vartsikhe Cascade

Energy Solutions practiced the best cooperation of Georgian and German specialists to identify week points points of the cascade type HPP ...

Digomi HPP

Installed Capacity 12,5 MW

The project is implemented in cooperation with the construction company GMG LLC.  The project is at the initial stage of Prefeasibility Study.

Tskhvandiri HPP

Installed Capacity 9,8 MW.

Energy Solutions implemented a feasibility study for the project.

Okrili HPP

Installed Capacity 7 MW

Energy Solutions implemented a feasibility study for the project.

Ipari HPP

Installed Capacity 3.3 MW

Energy Solutions implemented a feasibility study for the project.

Nakra HPP

Installed Capacity 20.4 MW

Energy Solutions implemented a feasibility study for the project.

Khelra HPP

Installed Capacity 3.7 MW

Energy Solutions implemented a feasibility study for the project.

Tsablari HPP

Installed Capacity 15 MW

The company Energy Solutions has reviewed and optimized the existing final project.

WhatsApp Image 2021-12-17 at 13.33_edited.jpg

Enguri HPP

Installed Capacity 1300 MW

Enguri Arch Dam - Design and installation of oil governing system for HPP low level outlet gates; Identification and fixing malfunction of mechanical, electrical ...

Sanalia
HPP

Optimization scheme development;

Energy Solutions has created Power increase concept design from 750 kW to 3,5 MW for international investment company

Mleta HPP

Installed Capacity 10 MW

 

Energy Solutions has designed 35 kV substation and underground cable for network connection, also implemented design works for the same project, but with 110/35/6 kV substation.

Dedoplistskaro solar Plant

Installed Capacity 7 MW

 

Technical and financial Due Diligence; Technical design of network connection of to the national grid.

Skhalta HPP

Installed Capacity 9 MW

Energy Solutions has designed 35 kV OHTL for connection of HPP to the national Grid.

Lara HPP

Installed Capacity 13 MW

The project is at the initial stage of Pre- feasibility study.