Installed Capacity 15,9 MW; Annual Generation 80 mln kWh;
In 2014 Energy Solutions has raised the equity investor for project development...
Aragvi HPP
Installed capacity 8 MW.
Contract for construction of 110 kV substation and high voltage power transmission line...
Marneuli HPP
Installed Capacity 250 KW; Annual Generation 1,9 mln kWh
In 2014 Energy Solutions acquired building remnants of mini ...
Optimization of Vartsikhe Cascade
Energy Solutions practiced the best cooperation of Georgian and German specialists to identify week points points of the cascade type HPP ...
Digomi HPP
Installed Capacity 12,5 MW
The project is implemented in cooperation with the construction company GMG LLC. The project is at the initial stage of Prefeasibility Study.
Tskhvandiri HPP
Installed Capacity 9,8 MW.
Energy Solutions implemented a feasibility study for the project.
Okrili HPP
Installed Capacity 7 MW
Energy Solutions implemented a feasibility study for the project.
Ipari HPP
Installed Capacity 3.3 MW
Energy Solutions implemented a feasibility study for the project.
Nakra HPP
Installed Capacity 20.4 MW
Energy Solutions implemented a feasibility study for the project.
Khelra HPP
Installed Capacity 3.7 MW
Energy Solutions implemented a feasibility study for the project.
Tsablari HPP
Installed Capacity 15 MW
The company Energy Solutions has reviewed and optimized the existing final project.
Enguri HPP
Installed Capacity 1300 MW
Enguri Arch Dam - Design and installation of oil governing system for HPP low level outlet gates; Identification and fixing malfunction of mechanical, electrical ...
Sanalia
HPP
Optimization scheme development;
Energy Solutions has created Power increase concept design from 750 kW to 3,5 MW for international investment company
Mleta HPP
Installed Capacity 10 MW
Energy Solutions has designed 35 kV substation and underground cable for network connection, also implemented design works for the same project, but with 110/35/6 kV substation.
Dedoplistskaro solar Plant
Installed Capacity 7 MW
Technical and financial Due Diligence; Technical design of network connection of to the national grid.
Skhalta HPP
Installed Capacity 9 MW
Energy Solutions has designed 35 kV OHTL for connection of HPP to the national Grid.
Lara HPP
Installed Capacity 13 MW
The project is at the initial stage of Pre- feasibility study.